Almost done roughing in all this stuff. Shower drain is off center about an 1-1/4” so that will be getting moved. Going with a 28” linear drain and want it to look right. But all the shower stuff is roughed in finally. Need a couple more nipples for stub outs. Speaker wire and cables are tacked off in the general area they’re going in. I’m going by Ferguson’s tomorrow to make a template of the corner of the tub since it’s rounded to get the pedestal faucet valve absolutely prefect. I was going to put in center on the front side, but that’s the lowest point to enter and exit the tub at 19” and I can see it being used as a handle bar by the kids. So front right corner it is. But the framing is all done, shifted the entry door down with in an inch of the toilet room door across from it so the ship lap around the tub walls will be symmetrical. Ran a 1/2” pex line from my vanity to the steamer in the attic. 324 cpvc for the pan and relief line off the steamer. Gotta punch those outside, throw in some insulation, and she be ready for tile. I’ll be insulating the pex line as well. Damn it’s going to look good. I’m hitting the couch the rest of the evening with some COD MW2, untill the bolts game comes on.