the concrete contractor dropped the slab 4" in the shower area.
the tile setter did a preslope on the slab.
the tile setter installed his membrane.
then he built a sand cement mud bed
then he set the tile.
the bench is solid concrete block covered in liner.
the tile setter did a preslope on the slab.
the tile setter installed his membrane.
then he built a sand cement mud bed
then he set the tile.
the bench is solid concrete block covered in liner.