Plumbing Zone - Professional Plumbers Forum banner

1 - 6 of 6 Posts

·
٩(͡๏̯͡๏)۶&#
Joined
·
8,329 Posts
Discussion Starter #1
The lower hole in the wall was already there from a previous DIY pipe repair(caused by flux burn thru)

Time taken: 3 hours
 

Attachments

·
Registered
Joined
·
1,122 Posts
The valve looks o.k., but who broke the tank lid?
 

·
٩(͡๏̯͡๏)۶&#
Joined
·
8,329 Posts
Discussion Starter #5
The 2x4 that was installed behind the old one was put back in front of the new one. The trim escutcheons clamp the 2x4 between the valve and the wall (Price Pfister). Locktite construction adhesive between the 2x4 and shower stall. Caulk on the shower trim.
 

·
Registered
Joined
·
584 Posts
The 2x4 that was installed behind the old one was put back in front of the new one. The trim escutcheons clamp the 2x4 between the valve and the wall (Price Pfister). Locktite construction adhesive between the 2x4 and shower stall. Caulk on the shower trim.
Gottcha.
 
1 - 6 of 6 Posts
Top