Default Thoughts on bid

So my brother in law works for a commercial GC and he offered me a small portion of a restroom remodel.

Basically swapping out the Sloan flush valves for the new auto ones. The swap would only be after the shutoff on the valve. 3 urinals & 17 toilets.

I have an idea of what I would bid, but I wanna hear your thoughts!
Fatpat is offline   Reply With Quote

Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. PlumbingZone.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any construction or remodeling task!

Sponsored Links
Advertisement
 
Old 09-10-2019, 03:32 PM   #2
Super Moderator
 
OpenSights's Avatar
 
Join Date: Mar 2015
Location: Grand Ledge, MI
Posts: 4,910

View OpenSights's Photo Album My Photos
Default

Assuming the shut offs work... are the Sloan valves provided.

I can’t say I’ve ever changed 20 at one time, but a simple swap out, including the spud takes me about 15-20 minutes or less? Unless there’s that unforeseen problem.

For me, I’d bid it at 45 minutes each at my hourly rate and cushion it with an extra two-three hours.

If providing the valves, cost+tax plus 25% mark up or list. Whichever is higher.
GAN and MASTRPLUMB like this.

Last edited by OpenSights; 09-10-2019 at 03:36 PM..
OpenSights is offline   Reply With Quote
The Following User Says Thank You to OpenSights For This Useful Post:
Tommy plumber (09-10-2019)
Old 09-10-2019, 07:56 PM   #3
Senior Member
 
Fatpat's Avatar
 
Join Date: Nov 2015
Location: Long Beach, CA
Posts: 596

View Fatpat's Photo Album My Photos
Default

Quote:
Originally Posted by OpenSights View Post
Assuming the shut offs work... are the Sloan valves provided.

I can’t say I’ve ever changed 20 at one time, but a simple swap out, including the spud takes me about 15-20 minutes or less? Unless there’s that unforeseen problem.

For me, I’d bid it at 45 minutes each at my hourly rate and cushion it with an extra two-three hours.

If providing the valves, cost+tax plus 25% mark up or list. Whichever is higher.
Valves are not provided.
Fatpat is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old 09-10-2019, 08:12 PM   #4
Senior Member
 
skoronesa's Avatar
 
Join Date: Oct 2015
Posts: 1,436

View skoronesa's Photo Album My Photos
Default

Are you changing out the entire valve or just the head for the sensor version?




Like they said, assuming the stops hold. I would go spend an hour and test each stop before you bid. Then even if all of them work at that moment figure in for changing at least one stop.








.
__________________
Want privacy from the diy/hacks? Too bad, the motherland has fallen, freedom is dead.


"I'd rather have Questions that can't be answered, then Answers that can't be questioned"
skoronesa is offline   Reply With Quote
Old 09-10-2019, 08:47 PM   #5
Senior Member
 
Fatpat's Avatar
 
Join Date: Nov 2015
Location: Long Beach, CA
Posts: 596

View Fatpat's Photo Album My Photos
Default

Quote:
Originally Posted by skoronesa View Post
Are you changing out the entire valve or just the head for the sensor version?




Like they said, assuming the stops hold. I would go spend an hour and test each stop before you bid. Then even if all of them work at that moment figure in for changing at least one stop.








.
Changing everything left of the shut of valve.
OpenSights and MASTRPLUMB like this.
Fatpat is offline   Reply With Quote
Old 09-11-2019, 10:21 AM   #6
The Old (antique) Master
 
PLUMBER_BILL's Avatar
 
Join Date: Oct 2009
Location: ALLENTOWN, PA
Posts: 2,245

View PLUMBER_BILL's Photo Album My Photos
Default

Quote:
Originally Posted by Fatpat View Post
Changing everything left of the shut of valve.
What if it's ADA and the shutoff valve is on the left?

LOL
GAN, Gargalaxy, OpenSights and 2 others like this.
__________________
Bill Parr LMP
www.parrsplumbing.net
For my alternate web site, click on ...
A little of this and a little of that
PLUMBER_BILL is offline   Reply With Quote
Old 09-11-2019, 10:43 AM   #7
Senior Member
 
Plumbus's Avatar
 
Join Date: Aug 2008
Location: San Francisco Peninsula
Posts: 2,158

View Plumbus's Photo Album My Photos
Default

An hour each and give yourself a 25% margin on the parts.
As Bill would say, that means taking your net cost and multiplying it by 33%. Then, add tax.
OpenSights and MASTRPLUMB like this.
Plumbus is offline   Reply With Quote
Old 09-11-2019, 05:34 PM   #8
Senior Member
 
Fatpat's Avatar
 
Join Date: Nov 2015
Location: Long Beach, CA
Posts: 596

View Fatpat's Photo Album My Photos
Default

Quote:
Originally Posted by PLUMBER_BILL View Post
Quote:
Originally Posted by Fatpat View Post
Changing everything left of the shut of valve.
What if it's ADA and the shutoff valve is on the left?

LOL
Then I’m f**ked haha
OpenSights likes this.
Fatpat is offline   Reply With Quote
Old 09-12-2019, 08:16 PM   #9
Senior Member
 
dhal22's Avatar
 
Join Date: Jul 2010
Posts: 3,222

View dhal22's Photo Album My Photos
Default

$100 labor each would give you a nice 1/2 -- 3/4 day income. Mark up the valves and offer all at a flat rate price.
dhal22 is offline   Reply With Quote
Old Yesterday, 05:12 PM   #10
philosopher and statesmen
 
Master Mark's Avatar
 
Join Date: Aug 2009
Location: Indianapolis indiana ...
Posts: 6,915

View Master Mark's Photo Album My Photos
Default

How old is the building you are working in....??

I walked away from something like this a few months back because
I was deathly afraid of all of the old galvanized nipples coming out of the wall
and the extreme age of the old sloan valves that they wanted all changed out..
all this on a concrete block wall with minimal to no acess

it was a huge old building with no 100% positive way to shut it all down if necessary----I politely told them I would get back to them with an estimate which they are still waiting on today.....

Sooo you have to ask yourself ---- are they giving me a $$ big money deal here or are they really just handing me off a huge bag of shi/ and all their troubles to me??........

__________________
God created man in his own image and likeness but Sam Colt made them equal."
http://weilhammerplumbing.com/
http://plumberindianapolis.com/

https://www.youtube.com/watch?v=tQMO1eyMRuM
Master Mark is offline   Reply With Quote
The Following User Says Thank You to Master Mark For This Useful Post:
Tango (Yesterday)
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



All times are GMT -4. The time now is 04:29 AM.


Powered by vBulletin® Version 3.8.8
Copyright ©2000 - 2019, vBulletin Solutions, Inc.
Search Engine Optimization by vBSEO 3.6.1
vBulletin Security provided by vBSecurity v2.2.2 (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
User Alert System provided by Advanced User Tagging (Pro) - vBulletin Mods & Addons Copyright © 2019 DragonByte Technologies Ltd.
Our Pro Sites Network
ContractorTalk.com | DrywallTalk.com | ElectricianTalk.com | HVACSite.com | PaintTalk.com | RoofingTalk.com