![]() |
|
|
|
#1 |
|
Moderator
|
Mechanical Engineer today.
Can you believe it. I couldn't. I made suggestions in the pre-bid meeting. He just says yeah that sounds like a good way to save money/make the job go faster. I was speechless. I was all ready to argue as to why I couldn't use pro-press or victaulic. It's a pretty cool school job. I hope to get the job. 90 geo-thermal wells with a 6" PE loop running around the exterior of the building with taps entering each classroom to coils. 4 large condensing boilers and a butt-load of pipe. I'll spend all weekend studying plans now. Just when I think the economy is shutting down another big job comes along. There are nice guys out there after all. |
|
|
|
Join the #1 Plumbers Forum Today - It's Totally Free! PlumbingZone.com - Are you a Professional Plumbing Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for plumbers to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that PlumbingZone.com is a great community to join. Best of all it's totally free! |
|
|
#4 |
|
residential service
|
|
|
|
|
|
|
#7 |
|
Member
|
at public work you have to pay prevailing wages, so you are looking @ 80 to 90.00 $$/hr. if you do pay it, and your competitors will, not, forget about this job. at this economy people get into public works completely low bolling, and chances are they will suffer, but it will be down the road.
|
|
|
|
|
|
#8 |
|
Moderator
|
It is a prevailing wage / tax exempt job. Which makes up 95% of what I do. We are union so I pay prevailing on ALL the jobs I do.
The playing field is more level on the prevailing wage jobs than the non prevailing wage. 1. The jobs are large enough the hacks can't get bonded for them 2. The insurance requirements prevent the hacks from doing them 3. The shear man-power needed prevents the hacks from doing them 4. All us commercial plumbers and fitters need to take a hard look at public works project. They are going to be the ONLY projects. Other than refineries you will not see too much commercial work in the private sector. |
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Have a nice vacation Ron! | Wethead | Off Topic | 9 | 12-31-2008 10:19 PM |
| Nice Trucks!!! | para1 | Plumbing Pictures | 7 | 11-14-2008 09:41 PM |
| Nice !! | Cal | Introductions | 6 | 06-18-2008 10:37 AM |