![]() |
|
|
|||||||
| Register | Plumbing Photos | FAQ | Members List | Contractor Talk | Search | Today's Posts | Mark Forums Read | Chat Room |
![]() |
|
|
Thread Tools | Display Modes |
|
|
#1 |
|
soccer mom
|
It's been pretty interesting. I have waited entire days for operations to hang a card on a breaker so we could replace a backwater valve. Our last job was repiping 2" SV cast iron that was hanging in clevis hangers, but they used push gaskets! They also installed tees on their backs, instead of combos. This was in a hot area, there was no smearable radiation, but it was "fixed", because some pump's packing had leaked radioactive steam and it had penetrated the concrete pads. We didn't have to suit up, but had to use a hand held monitor to check our hands and feet every time we entered or left the roped off work area. A little different, it was a ***** to work off a platform and slam home spigots into gasketed hubs. But usually if I swung my purse hard enough, we could get them home.
|
|
|
|
| The Following User Says Thank You to 422 plumber For This Useful Post: | Airgap (03-06-2010) |
Join the #1 Plumbers Forum Today - It's Totally Free! PlumbingZone.com - Are you a Professional Plumbing Contractor? If so we invite you to join our community and see what it has to offer. Our site is specifically designed for you and it's the leading place for plumbers to meet online. No homeowners asking DIY questions. Just fellow tradesmen who enjoy talking about their business, their trade, and anything else that comes up. No matter what your specialty is you'll find that PlumbingZone.com is a great community to join. Best of all it's totally free! |
|
|
#3 |
|
soccer mom
|
Green,
it's a different breed of work. To change a backwater valve took 6 hours of work time and 12 hours of sitting and waiting. Everything has to be "like for like." I wanted to change the 2" SV to no-Hub, but that that is a change, which requires an engineering study and approval. It's actually cool and frustrating at the same time. The plant is the 1st commercial nuke plant in the world. Unit 1 is mothballed, and we got to walk thru some of it, it's like being in a movie. The nuts on the reactor head bolts are like 3' across. Security is a hassle. You have to take off all outer clothing and headgear. Put it thru the fluoroscope, then step in the explosives sniffer, which blows air onto you, and then measures it for explosives, then you go thru the metal detector. Then you wait for your escort. It's hard having to sit and do nothing for hours, then have to work. I have sat at the checkpoint for over two hours because they didn't have enough guards on duty. It all pays the same, though. |
|
|
|
| The Following 2 Users Say Thank You to 422 plumber For This Useful Post: | GREENPLUM (03-06-2010), pauliplumber (03-06-2010) |
|
|
#4 |
|
jA-Rod dat u?
|
I Thought the first commercial nuke plant was Calder Hall in Sellafield, England...
![]() They cranked that one up in 1956...
__________________
"Fascism should rightly be called Corporatism, as it is the merger of corporate and government power." ~Benito Mussolini~ Lloyd Blankfein for President 2012 - Save Money Cut Out The Middleman!
|
|
|
|
|
|
#6 |
|
soccer mom
|
You can't take your cell phone in certain areas. You aren't supposed to take pics without permission. I don't have unescorted access anymore, so it's hard to take pics. I will take some that aren't easily recognizable/traceable when I go back to work on the water softeners. I really wish I could take pictures to show the enormous scale of these places. Most plumbers don't get the chance to work on these sites. Fitters, millwrights, carpenters, laborers, everybody but us plumbers. My boss just told me that I will be doing the plumbing on a new contractor support building. If that happens, I will be able to take a lot of pics.
|
|
|
|
![]() |
| Thread Tools | |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| I saved a nuclear outage | 422 plumber | Drain and Sewer Cleaning | 11 | 10-14-2009 01:30 PM |
| Who checks a plumbing inspectors plumbing? | Bill | Plumbing Code | 29 | 07-05-2009 07:24 PM |